The long-term allocated capacities for delivery date 30/12/2019 on the corridor from France to Italy, Slovenia to Italy, Austria to Italy and Switzerland to Italy have been curtailed to ensure operation remains within Operational Security Limits.

FR>IT:

On position 2 it was reduced to 1997 MW

From position 3 to 4 it was reduced to 1693 MW

On position 5 it was reduced to 1759 MW

On position 6 it was reduced to 2015 MW

On position 7 it was reduced to 2187 MW

On position 8 it was reduced to 1835 MW

On position 9 it was reduced to 1489 MW

On position 10 it was reduced to 1728 MW

On position 11 it was reduced to 1646 MW

On position 12 it was reduced to 1590 MW

On position 13 it was reduced to 1520 MW

On position 14 it was reduced to 1400 MW

On position 15 it was reduced to 1647 MW

On position 16 it was reduced to 1688 MW

On position 17 it was reduced to 2025 MW

SI>IT

From position 3 to 4 it was reduced to 337 MW

On position 9 it was reduced to 331 MW

On position 13 it was reduced to 337 MW

On position 14 it was reduced to 316 MW

AT>IT

On position 14 it was reduced to 138 MW

CH>IT

On position 9 it was reduced by 18%

On position 10 it was reduced by 3%

On position 11 it was reduced by 8%

On position 12 it was reduced by 11%

On position 13 it was reduced by 16%

On position 14 it was reduced by 23%

On position 15 it was reduced by 5%

Please consider the latest version of the programming authorizations.