The long-term allocated capacity for delivery date 01/11/2018 on the corridor from Austria to Italy and Italy to Austria has been curtailed to ensure operation remains within Operational Security Limits.

AT>IT:

From position 1 to position 3 reduced to 44 MW

On position 4 reduced to 37 MW

IT>AT:

From position 1 to 24 reduced to 43 MW

Please consider the latest version of the programming authorizations.