The long-term allocated capacities for delivery date 06/04/2020 on the corridor from France to Spain and from Switzerland to Italy have been curtailed to ensure operation remains within Operational Security Limits.
FR>ES
From positions 8 to position 12 it was reduced to 1279 MW
From positions 18 to position 24 it was reduced to 1226 MW
CH>IT
On position 2 it was reduced by 37%
On position 3 it was reduced by 40%
On positions 4 and 5 it was reduced by 48%
On position 6 it was reduced by 12%
On position 7 it was reduced by 10%
On positions 9 and 10 it was reduced by 18%
On position 11 it was reduced by 36%
On position 12 it was reduced by 39%
From positions 13 to 15 it was reduced by 42%
On positions 16 and 17 it was reduced by 36%
On position 18 it was reduced by 11%
Please consider the latest version of the programming authorizations.