Reinforcement of 380.102 Horta-Avelgem

Published:

Dear Market Participants,

 

Elia is currently working on upgrading the capacity of the 400kV Elia grid (cfr federal grid development plan).

 

One of the steps of the grid reinforcement comes with the line 380.102 between Horta and Avelgem equipped in HTLS (High Temperature Low Sag) as of Friday the 11th of September 2020.

 

A capacity increase of the line is achieved by replacing the conductors with HTLS conductors. HTLS conductors contain a core of carbon fiber, which allows the line to be operated at a much higher temperature, without compromising safety distances. Capacity of the line is coming from 1439MVA and becomes 2785MVA under the summer criteria.

 

Afterwards the HTLS upgrade will continue with the line 380.101, also between Horta and Avelgem, this line will be available at an increased capacity later in the year.

 

Elia System Operator S.A.

This message and its attachments may contain confidential information protected by intellectual property rights or other rights & is strictly for the exclusive use of the intended recipient. It is strictly prohibited to copy, alter or disclose this message or its contents to any other person without Elia's prior consent. If you are not the intended recipient of this message, please inform the person who sent it and delete the message from your system. Elia is not liable for any direct or indirect damage arising from errors, inaccuracies or any loss in the message, from unauthorized use, disclosure, copying or alteration of it or as a result of any virus being passed on. This message does not constitute any commitment from Elia except when expressly otherwise agreed between the intended recipient and Elia. U vindt de Nederlandse versie van deze disclaimer op onze internetsite  www.elia.be Vous pouvez d?couvrir la version fran?aise de ce disclaimer sur notre site internet www.elia.be