[CWE FB MC DA] LIGHT SPAIC publication - IMPACT ASSESSMENT FOR THE OUTAGE OF 380 kV LINE AVELGEM-MASTAING
Dear Market Participants,
Elia plans the outage of the 380 kV line Avelgem - Mastaing (380.79) between 02/08/2021 (week 31) and 29/10/2021 (week 43) for upgrade works. The capacity of this outaged line is reduced to 0 MW during this period.
Following the continuous effort for enhanced transparency at CWE, ELIA has performed a light SPAIC analysis. A Light SPAIC analysis consists of a comparison of flow-based domains for 7 typical “reference” days, selected by the relevant TSO(s) in the period between 12 and 8 weeks preceding the outage, in order to estimate the impact of a change in grid topology.
In line with the CWE Light SPAIC methodology, the analysis made here gives the relevant Flow-Based parameters of the historical FB domain and the domain obtained by updating the historical grid with the planned outage.
The enclosed documents provide the results of the performed SPAIC analysis for the reference period.
Best Regards,
ELIA